Uttarakhand glacier catastrophe: Search and rescue operations under way in Chamoli
[ad_1]
At least 14 individuals have been killed and over 150 are lacking after a portion of the Nanda Devi glacier broke off in Uttarakhand’s Chamoli district on Sunday, triggering an avalanche and a deluge in the Alaknanda river system.
The sudden flood in the center of the day in the Dhauli Ganga, Rishi Ganga and Alaknanda rivers — all intricately linked tributaries of the Ganga — triggered widespread panic and large-scale devastation in the excessive mountain areas.
Two energy tasks – NTPC’s Tapovan-Vishnugad hydel undertaking and the Rishi Ganga Hydel Project – had been extensively broken with scores of labourers trapped in tunnels because the waters got here speeding in.
Here are the most recent updates:
9.30 am
Rajya Sabha to be appraised after “full details” emerge
Rajya Sabha Chairman Venkaiah Naidu stated in that the House will likely be appraised on the state of affairs in Uttarakhand after “full details” emerge. He was responding to members’ request that the Home Minister present a report back to the House of the search and rescue mission, and different particulars.
“As far as issue of Uttarakhand is concerned, the entire country is concerned. Today morning, I spoke to Chief Minister of Uttarakhand, and he told me all efforts are on. There is no certainty on number of casualties as the tunnel is long. Multiple agencies are working on rescue mission. Let us wait for some time and get full details, MHA is looking into this and PM is reviewing it,” he stated.
“Wait for the full report and then I will ask the Home Minister to apprise the House of the situation,” he added.
9 am
Search and rescue operations under way in Chamoli
A joint staff comprising the Indo-Tibetan Border Police and the National Disaster Response Force personnel (NDRF) are persevering with the search operation for trapped labourers.
“The work of removing slush from the 2.5-km-long tunnel at Tapovan is still under way. JCB has been deployed. Three NDRF teams had joined the rescue operations earlier along with canine search squads. More personnel are being air lifted using MI-17 helicopters,” stated NDRF Director-General S.N. Pradhan.
Uttarakhand Director-General of Police Ashok Kumar advised the media that following the glacier burst, boulders and particles brought about huge harm to the Raini energy undertaking. In all, 32 folks from the primary and 121 folks from the second undertaking had been lacking.
Rajya Sabha | 9.50 am
Experts level to local weather change affect
A deluge that resulted from a glacial soften on Nanda Devi flooded the Rishiganga river in Uttarakhand and washed away a minimum of two hydroelectric energy tasks — the13.2 MW Rishiganga hydroelectric energy undertaking and the Tapovan undertaking on the Dhauliganga river, a tributary of the Alakananda.
There had been additionally considerations that the surplus water would additional journey downstream to the river Alaknanda and threaten villages in addition to hydro tasks on the river.
However the India Meteorological Department has stated that no rains are forecast. Officials of the Central Water Commission in the meantime stated the flooding from the glacial burst has been contained.
Tapovan hydel undertaking totally washed away, says ITBP Officer
Venudhar Nayak, Commanding Officer of the Indo Tibetan Border Police (ITBP) who led the rescue operation on the tunnel of the NTPC’s Tapovan hydel undertaking, the place 12 staff had been rescued after a seven-hour operation on Sunday, stated the undertaking was completely washed away, and the few homes that stay undamaged on the positioning had been lined in slush upto 20 ft deep.
Over hundred individuals are lacking after the flash flood, brought on by the splintering of a glacier, washed away two hydel energy tasks — the Rishiganga small hydro undertaking and National Thermal Power Corporation’s (NTPC) Tapovan undertaking on the banks of the Dhauliganga river in north Uttarakhand.
Mr. Nayak, whose staff of 250 personnel had been the primary to succeed in the Tapovan undertaking stated it took them seven hours to unblock the tunnel the place 12 individuals had been struck.
[ad_2]